Factory-direct-hardware Von Duprin 22EOF4 Manual de usuario Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
911333_00(9) Page 4 of 12
RHR shown
LHR opposite
39-13/16”
to finished
floor
L
C
1.1. Mark centerline C location as shown in Figure 1-1.
1.2. For 299 or 299F strike: Tape strike template to frame
aligned with center line C as shown in Figure 1-2.
Mark and prepare mounting holes per template.
For 1409/1439 strike: Prepare frame as shown in Figure 1-3.
L
L
Figure 1-1
For double door, mullion is
already prepared for 499F strike.
Skip this step and go to Step #2.
NOTE
!
L
C
Figure 1-2. 299 or 299F Strike
Figure 1-3. 1409/1439 Strike
Template
For single door, prepare frame for 299, 299F, 1409/1439 strike.
1
INSTALLATION
7/8”
7/16”
7/16”
1-9/16” to
face of
door
Blade stop
7/8”
Cut -out
#25 Drill
#10-24 tap
1/8” Drill pilot
1” deep
MetalWood
L
C
L
C
Vista de pagina 3
1 2 3 4 5 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios